Herne Block 6 BCI designed turbine foundations for Siemens – from structural analysis to detailed BIM design. more
GDK Mellach BCI was responsible for the structural and dynamic design for Austria's highest-capacity power plant (838 MW) in Styria and supported the critical construction phases on site. more
Knapsack combined-cycle power plant In 2011, BCI optimised the steel structures and stacks of the new unit at the Knapsack power plant for Siemens. Complex 3D modelling ensured economical and precise results. more
Timelkam combined-cycle power plant The modern combined-cycle power plant in Timelkam (Upper Austria) replaced a coal-fired power plant. It was built as a single-shaft unit, for which BauCon International designed the deep foundations. more
More projects Explore our completed combined cycle projects, references and global power plant engineering. more